BC Stories
Highway 1 Reopens at Tank Hill After Major Upgrades
By News Desk

Highway 1 at Tank Hill east of Lytton, where it currently crosses the CPKC mainline at grade. One of the supports for the new highway overpass is shown at centre left, and the line indicates the approximate elevation of the highway when the project is complete. (Shelanne Justice Photography)
Upgrades Improve Safety and Capacity
The Tank Hill upgrades focused on:
- Stabilizing terrain and reinforcing bridges
- Installing modern drainage systems to reduce washouts
- Expanding capacity to ease long-standing bottlenecks
Provincial officials noted these improvements will significantly benefit both local drivers and long-haul transporters who rely on the corridor daily.
A Step Toward Long-Term Resilience
The reopening is part of a larger vision for BC’s highway system, which faces growing pressures from population growth, climate change, and economic expansion. While travelers can now enjoy a smoother ride through Tank Hill, the government has signaled more upgrades are planned across other vulnerable stretches of the Trans-Canada Highway.
For communities dependent on this corridor for goods and services, the project is being welcomed as a step forward in strengthening long-term resilience and connectivity.
To send a tip or ask about advertising, write to [email protected] or call 250-317-5888.
